1
2
3
4
5
6
7
8
9
10
11
12












before renovation, plaster ceiling and walls cracked and falling down.
before renovation, flooring was linoleum, which was also in disrepair.
After all plaster removed, tub, sink and toilet also removed in addition to flooring, new ceramic tile floor added and greenboard installed throughout.
custom ceramic tile shower installed with all new copper piping.
bathroom was redesigned to include walk in closet behind the shower. All new electric brought up to code. Custom trimwork added.
New sink, vanity, and fixtures to complete the look.
New bathroom also includes a linen closet.
completed
Like us on Facebook and Follow us on Twitter and Instragram